Isotope
by EVM Synths
2.2 / 5     (5 votes)
Show more
Win32
   
VST
The Isotope synth is a multiwave groove synthesizer.
  • 4 Oscillator Unison mode.
  • 2 Sub oscillators in split transposition mode.
  • EVM Multiwave technology for a wide stereo spread.
  • Almost 100 waves.
  • Individual filter for each Osc with Phase variable contour frequency response.
  • 4 Stage ADSR with Filter, contour and Osc pitch response.
  • Built in Digital Delay line.
  • Complex modulation with 2 LFO's and multiple destinations.
  • 16 Patch memory programs.
  • Selectable pitch bend range for realtime pitch wheel control .
  • 8 Channel Groove Sequencer Filter,Waves and Oscillator Cross-Mod.
Downloads